S-9 CHAOS

CALCULATE AND SUBMIT FORMS

KIT QUOTE FORM

3-view

HIGHLIGHTED FEATURES

4130 WELDED STEEL FUSELAGE AND TAIL GROUP

HEAT TREATED STEEL LANDING GEAR

3" MAIN SPARS

2" AFT SPARS

HYDRAULIC TOE BRAKES

FULL SPAN 2:1 DIFFERENTIAL AILERONS

ALUMINUM LEADING EDGE WRAP

5" ALUMINUM WHEELS AND AIRCRAFT TIRES

PVC AILERON GAP SEALS

TRUSSED RIBS

9 GALLON WING TANK

HEADERTANK

ADJUSTABLE SEAT, FORE/AFT

WELDED ALUMINUM ONE-PIECE CANOPY FRAME

2.7 OZ AIRCRAFT COVERING FABRIC

ALL SURFACE TAPES, LACING, INSPECTION PLATES AND EXIT COVERS

IN-FLIGHT PITCH TRIM

DEEP SET PANEL

ROLL-OVER PROTECTION

DUAL ELEVATOR HORNS

PUSH-PULL ELEVATOR TUBE

CABLE OPERATED RUDDER

PRE-MOLDED COWLING AND SPINNER (PROVIDED WITH FWF KIT)

HEAVY DUTY 4130 WELDED STEEL ENGINE MOUNT W/4 POINT ISOLATION

UNDER-THE-WING WINDOWS

COCKPIT AIR INLET VENT

FUSELAGE FOOT PEG AND WING STEP

BALL BEARING AIRCRAFT CONTROL PULLEYS

FOLDING TAIL

WINGS REMOVE IN MINUTES, FOR TRANSPORT

DUAL CABLE-BRACED TAIL

STEERABLE TAIL WHEEL

WHEEL PANTS

ALUMINUM AIRFOIL STRUTS

FIREWALL SOUND PROOFING

SHOULDER HARNESS/LAP BELT

The S-9 Chaos is a FAA approved 51% kit

No welding required.

 

Build Time:  300-500 hours

OTHER OPTIONS

HEADRESTS

GASCOLATOR

POWDER COAT ENGINE MOUNT/TAIL

TINTED GLASS

HEATER, MUFFLER STYLE

2ND 9 GALLON WING TANK

REAR WINDOW

STREAMLINE FOOT STEP

MAIN GEAR LEG FAIRINGS

STROBE MOUNT KIT

ADJUSTABLE LIFT STRUT KIT

AILERON SPADES

AEROBATIC PACKAGE

COVERING FABRIC GLUE

HOOKER HARNESS (RECOMMENDED W/AEROBATIC PACKAGE)

SEE ORDER FORM FOR ENGINE AND PROP CHOICES

  • Facebook Clean
  • Twitter Clean
  • YouTube Clean

QUESTIONS?

CALL US AT 785-625-6346