RANS_Aircraft_Worm_Logo_B.png
  • Facebook Clean
  • Twitter Clean
  • YouTube Clean

HOME

READY TO FLY

AIRCRAFT

COMPLETIONS GALLERY

A/C SUPPORT

MEET US

CONTACT

LATEST NEWS

TESTIMONIALS

DEALERS

DIRECTIVES

PARTS MANUALS

AVAILABLE NOW!

FLIGHT TRAINING/ENDORSEMENTS

SPECS & 3-VIEWS

TERMS OF PURCHASE

WORK FOR RANS

AWARD WINNING RANS

FORUM

AIRCRAFT DOWNLOADS

PAINT CODES AND SCHEMES

CUSTOMER LOCATIONS
MANUALS
UPCOMING EVENTS
INSTRUCTIONAL VIDEOS
S-21 BUILD PHOTOS
PRE-OWNED RANS
Shop RANS
To see this working, head to your live site.
  • Categories
  • All Posts
  • My Posts
mjstarkey48
Sep 25, 2019

Elevator P/P assembly question

in S-21 TECH QUESTIONS

The instructions for installing the black 35" push/pull (KPCS0268) tube into the large alum tube going to the elevator (KPCS0305) are pretty devoid of detail.


The cross tube on the 35" P/P tube obviously needs to be trimmed to fit into the big tube and its internal doubler------but it is not clear if the assembly is designed to allow for motion between the two tubes.


For allowing movement, the cross tube (where the 1/4" bolt goes) should have a slight clearance inside the large alum tube, and should have square cut ends.


If this joining of the two tubes is designed to be ridged, I would look for minimum clearance, and a radius end for the cross tube.


Guidance please...........

1 comment
0
1 Comment

Share Your ThoughtsSign up to leave a comment.

E
eddie
Oct 09, 2019

Mike, we do radius the ends of the steel cross tube a bit, but we don't tighten it so there is no movement between the two.

0
1 comments

HOME

READY TO FLY

AIRCRAFT

COMPLETIONS GALLERY

A/C SUPPORT

MEET US

CONTACT

LATEST NEWS

TESTIMONIALS

DEALERS

DIRECTIVES

PARTS MANUALS

AVAILABLE NOW!

FLIGHT TRAINING/ENDORSEMENTS

SPECS & 3-VIEWS

TERMS OF PURCHASE

WORK FOR RANS

AWARD WINNING RANS

FORUM

AIRCRAFT DOWNLOADS

PAINT CODES AND SCHEMES

RANS_Aircraft_Worm_Logo_A.png
CUSTOMER LOCATIONS
PRE-OWNED RANS